Permanent Fencing Permit

The Permanent Fencing Permit authorizes developers to construct fences around plots in Eko Atlantic City.

Summarized Description

The Permanent Fencing Permit is a regulatory approval required for any developer intending to construct a permanent fence around a plot within Eko Atlantic City. The Eko Atlantic City Management Limited (EACML) oversees this process to ensure that all fencing works align with the city’s design standards, safety regulations, and urban aesthetics. The provision emphasizes that fences should not encroach on public sidewalks or streets to maintain unobstructed pedestrian and vehicular flow within the city.

Developers are required to apply formally for a fencing permit as outlined in Appendix GG, and upon successful review, the actual permit is issued as per Appendix HH. The application must be accompanied by detailed fence design drawings for EACML’s approval before any on-site construction begins. This pre-approval step ensures that all fences are consistent with the city’s architectural coherence and do not obstruct visibility or access.

Compulsory Requirements

To obtain a Permanent Fencing Permit, the following are mandatory:

  1. Formal Application Submission — Developer must apply using the prescribed format in Appendix GG.
  2. Fence Design Drawings — Complete architectural drawings of the proposed fence must be included.